Wilton Centre

For more information, or to discuss your requirements further, please get in touch with us or complete our short form.

Wilton Centre
Telephone: 01642 438050
enquiries@wiltoncentre.co.uk

Dodds Brown
Telephone: 01642 244130
prop@doddsbrown.co.uk

Knight Frank
Telephone: 0191 221 2211
patrick.matheson@knightfrank.com
tim.evans@knightfrank.com

Vanessa Clark - Sinclair Clark
Telephone: 020 7494 9399
vanessa@sinclairclark.co.uk

You are here: Home Wilton Centre News News Archive 2010 10 Company drives windfarm project from Centre base Login

Company drives windfarm project from Centre base

October 2010

The EDF Energy Renewables team which is now located at The Wilton Centre

The EDF Energy Renewables team which is now located at The Wilton Centre

EDF Energy Renewables has opened an office at The Wilton Centre as it continues to develop green technologies on Teesside.

The company, EDF Group’s UK renewables development arm, has been tasked with driving forward new projects including Teesside Windfarm Limited, which is developing the Teesside Offshore Wind Farm.

Consisting of 27 turbines, the farm will produce enough electricity for 40,000 homes, or most of the households in Redcar and Cleveland. In addition, the farm will offset the annual release of about 200,000 tonnes of carbon dioxide, the main greenhouse gas.

The company has chosen to site its project office at The Wilton Centre because it is near the construction works required for the development of the Teesside Offshore Wind Farm and is convenient for a number of contractors employed by EDF Energy Renewables.

The 2,500 sq ft of office space has been taken for two years and will act as the main Teesside Windfarm Limited project office base, employing 15-20 people.

More information is available from Teesside Project Administrator Lynne Plunkett at lynne.plunkett@edf-er.com, website www.edf-er.com

Wilton Centre are proud to be associated with:

UKSPA
Innovation Accelerator
Catapult Hight Value Manufacturing
Member of NOF energy